The Nigerian National Petroleum Corporation (NNPC), has commissioned a $60m Egbeoma Gas Processing Plant in Ebedei Community, Ukwuani Local Government of Delta State.

 Speaking at the commissioning event the Corporation”s Group Managing Director, Dr Maikanti Baru said that the corporation was committed to pursuing the Federal Government’s aspiration of aggressively deploying the nation’s vast gas resources for economic growth.

A statement by the NNPC Group General Manager, Group Public Affairs Division, Mr. Ndu Ughamadu,  said the Corporation is committed to the Federal Government’s aspirations as expressed in the gas policy, environmental policy and domestic gas utilization policy.

Some of the targets under the various government policies, Dr. Baru observed, include the effective monetization of the nation’s vast gas resources for sustainable economic growth and a complete end to gas flaring.

In particular, GMD said the corporation was pursuing aggressive growth in domestic gas supply capacity from the current 1.7bscfd to 5bscfd in the medium term, a growth which he explained, would come from the seven (7) critical gas development projects.

According to him, aside the gas supply growth, the NNPC was equally committed to the expansion of gas pipeline infrastructure network system.

“This expansion includes the Obiafu-Obrikom-Oben (OB3) gas pipeline which is less than 5km to Egbeoma Gas Plant and can serve as a major evacuation artery of the dry gas produced from the plant to the market,” he added.                                                                                                                                                                                                                                                                             

While congratulating PNG Gas Ltd, operators of the Egbeoma Gas Plant, Baru noted that the development fitted squarely into the Federal Government’s gas aspiration of using gas as an enabler for energy independence, industrial development, commerce and                                                                   environmental and social sustainability.

He also described the achievement as a “no mean feat”, adding that the conceptualization and actualization of the gas plant project dream had reinforced NNPC’s confidence in the potentials of Nigerian indigenous companies.

Baru urged operators whose assets are close to the plant and the OB3 pipeline to seize the opportunity by collaborating with PNG Gas Limited to supply gas to maximize the plant’s capacity, access and commercialize all existing flares and further develop the significant gas reserves of 1Tcf of gas in the area.

“I see this initiative as the beginning of an end to the last mile of gas flaring in Nigeria. This plant is a hallmark of Nigerian engineering prowess and local content capacity,” he added.

Earlier in his address, promoter of the Egbeoma Gas Plant project, Engr. Charles Osezua, said the plant represented the success story of Nigerian engineering.

“Our dream is to help realize the Federal Government’s drive of building a gas hub in this area by processing 150mmscfd of gas which will not only generate power but also support the growth of the nation’s economy,” Osezua stated.

He said as an industry leader, NNPC had a major role to play in galvanizing and bringing together the nation’s gas producers with a view to creating a gas hub in the country.

LEAVE A REPLY

Please enter your comment!
Please enter your name here